Southwestern Electric Power Company (SWEPCO) officials plan to strengthen the electric grid in the Texarkana region by rebuilding about 7 miles of 69-kilovolt (kV) transmission line.
The project involves:
The transmission line was constructed in 1961 and is past its planned service life. The project:
SWEPCO crews plan to install single-pole steel structures.
Typical Height: 85 feet
Typical Distance Between Structures: 320 feet
Typical Right-of-Way
Width: 60 - 100 feet
*Exact structure type and height may vary by location based on topography and other factors