Millbrook Park - South Point138-kV Transmission Line Rebuild Project


AEP Ohio representatives plan to increase electric reliability in Scioto and Lawrence counties by updating the local electric transmission system. The Millbrook Park-South Point 138-kV Transmission Line Rebuild Project involves upgrading about 35 miles of 138-kilovolt (kV) power line.

The existing transmission line consists of 90-year-old aging lattice towers. The infrastructure has shown significant deterioration resulting in service interruptions. Upgrading to modern steel poles reduces the need for ongoing power line maintenance and improves electric reliability.

Project Updates

Fall 2024: AEP Ohio representatives have filed a Letter of Notification with the Ohio Power Siting Board (OPSB) for the proposed rebuild of about 35 miles of 138-kV transmission line as the South Point – Portsmouth 138 kV (Millbrook Park – South Point) Rebuild Project, Public Utilities Commission of Ohio Case No. 24-0830-EL-BLN.

Project Releases

South Point – Portsmouth 138 kV (Millbrook Park – South Point) Rebuild Project Letter of Notification Application (PDF)

South Point – Portsmouth 138 kV (Millbrook Park – South Point) Rebuild Project Public Notice (PDF)

Timeline

Project Timeline

Structures

Structure

The project involves the use of single, steel poles.

Typical Pole Height Range: 75-105 feet*
Right-of-Way Width Range: 100-200 feet*

* Exact structure, height and right-of-way may vary

Resources

Property Easements Project Fact Sheet Access Roads Field Activities

AEP Ohio provides electricity to nearly 1.5 million customers.

www.AEPOhio.com

AEP Ohio Outreach

614-933-2998
AEPOhio_Outreach@aep.com

Submit a Message

*Required field. By clicking submit, you agree to AEP's Privacy Policy.

Please complete the ReCAPTCHA to submit the form. If you have difficulty, use the audio challenge option.

Paper plane

Your message has been sent! We'll be in touch shortly.