Fultonham AreaTransmission Line Rebuilds Project


AEP Ohio representatives plan to upgrade the local power grid in Perry and Muskingum counties.

The project involves:

  • Rebuilding about 25 miles of 69-kilovolt transmission line between six area substations.
  • Replacing deteriorating wooden poles with modern steel poles.

The upgrades enhance electric reliability by replacing aging infrastructure from the 1920s and 1950s. Modernizing equipment reduces the need for frequent maintenance and minimizes the likelihood of future service disruptions and outages.

Project Updates

Early 2026: Company representatives announced the project and plan to conduct surveys within the existing right-of-way.

Timeline

Open project timeline modal

Structures

Open project structure modal

The project involves the use of steel h-frames and single steel poles.

Pole Height: 60 - 115 feet*
Right-of-Way Width: 80 feet*

*Exact structure types, height and right-of-way requirements may vary

Resources

Property Easements Project Fact Sheet Project Map Access Roads Field Activities

AEP Ohio provides electricity to nearly 1.5 million customers.

www.AEPOhio.com

Kelly Foley Kruse

Project Outreach Specialist with WSP representing AEP Ohio
833-689-3375
Outreach@aeptransmission.com

Submit a Message

*Required field. By clicking submit, you agree to AEP's Privacy Policy.

Please complete the ReCAPTCHA to submit the form. If you have difficulty, use the audio challenge option.

Paper plane

Your message has been sent! We'll be in touch shortly.