Van Zandt CountyTransmission Improvements Project


Southwestern Electric Power (SWEPCO) proposes a 138-kilovolt transmission line in northeastern Van Zandt County. The project strengthens the local electric system and ensures safe, reliable service in the Grand Saline area.

The proposed transmission line route begins at a point of connection along an existing SWEPCO line near the Morton Salt Mine and ends about 3 miles east along an existing Wood County Electric Cooperative transmission line.

The SWEPCO project was made necessary following the removal of infrastructure owned by the Rayburn Country Electric Cooperative.

Project Updates

Southwestern Electric Power (SWEPCO) proposes a 138-kilovolt transmission line in northeastern Van Zandt County. The project strengthens the local electric system and ensures safe, reliable service in the Grand Saline area.

The proposed transmission line route begins at a point of connection along an existing SWEPCO line near the Morton Salt Mine and ends about 3 miles east along an existing Wood County Electric Cooperative transmission line.

The SWEPCO project was made necessary following the removal of infrastructure owned by the Rayburn Country Electric Cooperative.

Timeline

Project Timeline

Structures

Structure

Typical Distance Between Structures: 600 feet
Typical Structure Height: 80 feet
Typical Right-of-Way Width: 100 feet

* Exact structure, height and right-of-way may vary

Resources

Virtual Open House Project Fact Sheet Access Roads Field Activities

AEP Texas serves more than 900,000 electric consumers in the deregulated Texas marketplace.

www.AEPTexas.com

AEP Texas Project Team
1-844-629-4296