    Putnam Area Power Reliability Improvements Project

    AEP Texas representatives plan power line upgrades to help maintain the safety and reliability of the local power grid. The $17 million investment involves rebuilding about 21 miles of 138-kilovolt (kV transmission line near Putnam in Callahan and Eastland counties.

    The project involves:

    • Rebuilding about 21 miles of 138-kV transmission line
    • Replacing deteriorating wooden H-frame structures with single steel poles
    • Replacing existing wire

    Project Updates

     

    Project Releases

    Fact Sheet

    Timeline


    Structures

    The project involves installing steel poles.

    • Typical Pole Height: 65 feet
    • Typical Right-of-Way: 100 feet
    • Typical Distance Between Structures: 460 feet

    *Exact structure, height and right-of-way requirements may vary


    * The accompanying map depicts the project area. It should be noted that the map contained on this site is for information purposes only. AEP reserves the right to alter, change, or amend the map at any time without notice and AEP provides no warranty about the accuracy of content. Keep this in mind when reviewing this map. However, AEP will make all attempts to keep this map as accurate as possible. If you have any questions about the accuracy of the current map please Contact Us.